The Taylor X49463-80 Tune-up Kit is a complete maintenance package specifically engineered for Crown series C713, C717 and C723 soft serve and frozen yogurt machines. This comprehensive kit includes all essential o-rings and seals needed for quarterly maintenance to ensure optimal performance, consistent product quality, and extended equipment life.
Compatible Taylor Models
Crown Series: C713, C717 & C723
This kit is designed exclusively for Crown models C713, C717 and C723. For other models, please contact us at 800-879-7839 for the correct tune-up kit.
What's Included in This Kit
| Qty | Part Number | Description | Location |
|---|---|---|---|
| 6 | 014402 | O-Ring - 7/8 OD x .103W | Beater assembly |
| 6 | 016137 | O-Ring - 3/8 OD x .070W | Draw valve assembly |
| 2 | 016272 | O-Ring - 5/16 OD x .070W | Rear seal area |
| 8 | 018572 | O-Ring - .643 OD x .077W | Various locations |
| 2 | 032560 | Seal - Drive Shaft | Drive shaft assembly |
| 2 | 048926 | Gasket - Door - 4" Shell | Freezer door |
| 2 | 050216 | Bearing - Front | Front bearing assembly |
| 3 | 014218 | Cap Design - 1.010" ID - 6 PT | Cap assembly |
Replacement Schedule
Recommended Frequency: Every 3 months (quarterly) as recommended by Taylor
Why Quarterly Maintenance is Critical:
- Prevents product leaks that waste mix and create mess
- Maintains consistent product texture and quality
- Reduces risk of costly emergency breakdowns
- Extends compressor and motor life by reducing strain
- Keeps machine running efficiently, lowering energy costs
- Ensures compliance with health department standards
- Protects your investment in premium Crown equipment
Signs It's Time for a Tune-Up
Don't wait for a breakdown. Replace your tune-up kit if you notice:
- Product leaking from door seals or around beater assembly
- Inconsistent product texture (icy, too soft, or separated)
- Longer freeze times or difficulty reaching serving temperature
- O-rings showing cracks, hardening, or visible wear
- Difficulty removing or installing freezer door
- Increased compressor cycling or run time
- It's been 3+ months since your last tune-up
Installation Guide
Step-by-Step Process:
- Power off machine and remove all product from hoppers
- Remove freezer door and beater assembly from both barrels
- Disassemble beater components and remove old o-rings and seals
- Clean all surfaces thoroughly with approved sanitizer
- Inspect beater shaft and cylinder for wear or damage
- Apply food-grade lubricant to all new o-rings and seals
- Install new components from X49463-80 kit per service manual
- Reassemble beater and door assemblies carefully
- Run full sanitize cycle before returning to production
- Test both barrels for proper operation and consistency
Compatible Taylor® Models
- Taylor | C713
- Taylor | C723
Tune-Up Replacement Schedule
Replace seals and o-rings every 90 days to keep your machine clean, sanitary, and performing consistently. Worn seals can develop tiny micro-cracks that trap bacteria and cause drips or leaks that cleaning won’t fix.
- Every 90 days — Quarterly replacement keeps everything tight and sanitary.
- Stops drips and leaks around the door and freezer barrel.
- Prevents hidden bacteria in worn seals and micro-cracks.
- Cleaner machine, cleaner product — simplest maintenance you can do.